午夜免费福利小电影,欧美国产成人精品二区芒果视频,亚洲AV中文AⅤ无码AV接吻,美女毛片一区二区三区四区

Add to favorites|Contact us|Sitemap|中文版

Welcome to Hengshui Qijia Engineering Materials Co., Ltd!
Advisory hotline0318-5105289

Corrugated pipe culvert

The current position:Home > Industry

requirements of corrugated steel culvert construction

Time:2015-09-04 14:52
  The corrugated steel culvert construction should be chosen in the warm season, because of steel corrugated pipe culvert materials are metal, the pipe joint purchase and connecting bolts are required as anticorrosive processing, moreover because the site construction is the emergence of the anticorrosive coating of local defects and destroyed, need to take certain remedial measures according to the specific circumstances, such as increasing coating coating.
  Other technology of steel corrugated culvert construction requirements:
  Application of corrugated culvert
        1, steel in highway maintenance engineering, wait for the culvert and the body parts to the construction site, construction units to start dismantling the old culvert work, the removal of old culvert, also must grasp the basic material preparation, material preparation is complete, and the rear can be passed the inspection pit the excavation work. The corrugated steel culvert pipe applied in the newly built highway engineering, at the same time in purchasing corrugated culvert culvert can grasp of basic materials preparation and foundation pit excavation work.
  2, the import and export of corrugated steel pipe section can be used by manufacturers, with an opening two forms of straight pipe and rate the same slope and subgrade slope obliquely; also can according to the specific circumstances of the region where the using mortar rubble or dry rubble masonry. General in the cold area, adopting metal corrugated pipe section or dry rubble. In the river bed and joint import & Export ground and slope in certain range should establish double mortar rubble or dry flagstone paved, to prevent erosion, and the anti-seepage treatment necessary; in order to prevent the blockage of subgrade soil culvert entrance door at the mouth of the cave, and the embankment interchange do a certain height and thickness of the mortar rubble or dry stone tablets wall.
  3, culvert sides after low-lying seeper area, need to set the cofferdam, drainage water, if necessary, also need to clear the replacement part of silt.
  4, scour culvert import and export should be set corresponding regulating structures, at the same time the hole should be the necessary processing according to the terrain conditions, to prevent the hole from scour effect of discharge capacity of culvert.
  5, different fill mode requirements.
  The United States highway bridge design specification requirements: groove width anti slotted backfill shall be not less than the pipe diameter and 400mm, also should not be less than the tube diameter 1.5 times 300mm, provide enough space to install and backfill compaction to ensure.
国产精品无码v在线观看| 麻豆一区二区99久久久久| 色婷婷日日躁夜夜躁| 亚洲欧美aⅴ在线资源| 无码精品视频一区二区三区| 亚洲xxxx做受欧美| 狂野欧美性猛xxxx乱大交| 警察被两个混混脱裤玩j视频| 日本免费人成视频播放| 白又丰满大屁股bbbbb| 精品国产乱码久久久软件下载| 拍真实国产伦偷精品| 久久午夜福利无码1000合集| 国产欧美一区二区精品久久久| 亚洲youwu永久无码精品| 一本大道av伊人久久综合| 国产成人无码一区二区三区在线| 人妻有码中文字幕| 欧美人与性动交ccoo| 亚洲热妇无码av在线播放| 亚洲日韩一区二区一无码| 国产一在线精品一区在线观看 | 欧美性xxxx极品高清| 免费人成网站在线视频| 久久久人人人婷婷色东京热| 狠狠色噜噜狠狠狠777米奇| 人妻熟妇乱又伦精品视频| 麻豆国产av超爽剧情系列| 男女超爽视频免费播放| 日本高清aⅴ毛片免费| 精品无码国产一区二区三区麻豆| 亚洲av成人一区二区三区在线观看 | 看国产一毛片在线看手机看| 婷婷色香五月综合缴缴情| 被三个男人绑着躁我好爽视频| 激烈的性高湖波多野结衣| 亚洲码欧美码一区二区三区| b站永久免费看片大全| 牲欲强的熟妇农村老妇女| 国产成人精品无码片区在线观看| 亚洲精品美女久久7777777|